Unanticipated Challenges

Although the team planned for most of the issues that arose, some things required last-minute improvisation. For example, a number of logistical details had to be tracked closely. Because of the process the St. John’s team designed to prepare laptops, it was critical that backpacks and laptops be delivered to the University together. However, when the backpacks got stuck in shipping, the process had to be revised on the fly. Details such as finding forklifts and loading ramps went well beyond the scope of a typical IT project.